Developer and/or Project Registration
Assistance on compliance with DLD/RERA for developer and/or project registration
- Developer registration with RERA (if required)
- Checklist of documents and procedural requirements
- Developer license
- Nakheel Affection plan / Trakhees Site plan
- Demarcation certificate
- Contractor contract
- Consultant contract
- Concept / schematic / detail designs (as applicable)
- Building Permit (as applicable)
- Nakheel (master developer) Sales & Marketing NOC
- Registration in the OQOOD System
- Project survey (architectural drawings/apartment layouts)
- Registration of inventory in the OQOOD System
- Registration in TAS System (Trust Account System)
- Project Site Inspection Report as per RERA guidelines (zero percentage or percentage of works completed at the site, as applicable)
- Escrow account with an authorised escrow bank for project registration with RERA
- Fulfilment of 30% escrow account requirement (through developer equity, percentage of works completed at site or a combination)
- Project registration with RERA
- Application process for project registration
- Project registration certificate
- Project activation (TAS System)